
International Journal of Mining and Mineral Engineering
2023 Vol.14 No.4
Pages | Title and author(s) |
341-364 | New MIP model for short-term planning in open-pit mines considering loading machine performance: a case study in IranMohammad Mirzehi; Mojtaba Rezakhah; Amin Mousavi; Zohreh Nabavi DOI: 10.1504/IJMME.2023.137375 |
365-379 | Investigations for the low gold recovery at Mpanda Mineral Field in Western TanzaniaJeremiah Mosingo; Alphonce Wikedzi DOI: 10.1504/IJMME.2023.137370 |
380-396 | Flotation kinetics on upgraded rare earth bearing placer monazite, Bramhagiri coast, Odisha, IndiaDeependra Singh; Bighnaraj Mishra; Sunita Routry; Raghupatruni Bhima Rao DOI: 10.1504/IJMME.2023.137373 |
397-420 | A new roof cutting technique to enhance the stability of underground tunnels and improve the recovery rate of coal resources: a case studyRui Gao; Yongqing Lin; Zengchao Feng; Xianglin Dai; Xiangbin Meng DOI: 10.1504/IJMME.2023.137374 |
421-446 | Feasibility of pure calcium carbonate project at Zwizya, Central JordanAwwad Titi; Rami Al Rawashdeh DOI: 10.1504/IJMME.2023.137379 |