International Journal of Mining and Mineral Engineering
2013 Vol.4 No.4
Pages | Title and author(s) |
265-277 | Determination of the effect of economic uncertainties on mining project evaluation using Real Option ValuationHesam Dehghani; Majid Ataee-pour DOI: 10.1504/IJMME.2013.056850 |
278-295 | Simulation of a large multiple pit mining operation using GPSS/HClifford E. Stout; Paul W. Conrad; Charles S. Todd; Scott Rosenthal; H. Peter Knudsen DOI: 10.1504/IJMME.2013.056853 |
296-311 | Stemming plug and its effect on fragmentation and muckpile shape parametersBhanwar Singh Choudhary; Piyush Rai DOI: 10.1504/IJMME.2013.056854 |
312-332 | Risk assessment in mining industryShikha Verma; Mahendra Gupta DOI: 10.1504/IJMME.2013.056857 |
333-346 | Assessment of raw materials for cement industry in Sohag area, upper EgyptAhmed A. Abdel Moneim; El-Haddad A. Aziz; S.A. Abu El-Magd DOI: 10.1504/IJMME.2013.056868 |