
International Journal of Industrial and Systems Engineering
2011 Vol.8 No.4
| Pages | Title and author(s) |
| 407-431 | A tabu search approach for mixed-model parallel assembly line balancing problem (type II)Gholam Reza Esmaeilian, Shamsuddin Sulaiman, Napsiah Ismail, Maryam Hamedi, Megat Mohammad Hamdan Megat Ahmad DOI: 10.1504/IJISE.2011.041803 |
| 432-448 | Complexity measurement of a project activitySanjeev Sinha, Bimal Kumar, Avril Thomson DOI: 10.1504/IJISE.2011.041804 |
| 449-471 | Multi-criteria supplier evaluation and selection using fuzzy AHP (alpha cut analysis): a case studyN. Arunkumar, L. Karunamoorthy, S. Muthukumar DOI: 10.1504/IJISE.2011.041805 |
| 472-491 | Capacity management of an electricity service centre using simulationSony Michael, V. Mariappan DOI: 10.1504/IJISE.2011.041806 |
| 492-519 | Surrogate modelling and computational experience with the optimisation problemMohamed H. Gadallah DOI: 10.1504/IJISE.2011.041807 |