International Journal of Industrial and Systems Engineering
2008 Vol.3 No.6
Pages | Title and author(s) |
625-643 | A heuristic for priority-based scheduling in a turbine manufacturing job-shopSandeep Dulluri, V. Mahesh, C.S.P. Rao DOI: 10.1504/IJISE.2008.020678 |
644-672 | Application of ant colony optimisation algorithms in solving facility layout problems formulated as quadratic assignment problems: a reviewPhen Chiak See, Kuan Yew Wong DOI: 10.1504/IJISE.2008.020679 |
673-691 | A system maturity index for the systems engineering life cycleBrian J. Sauser, Jose E. Ramirez-Marquez, Devanandham Henry, Donald DiMarzio DOI: 10.1504/IJISE.2008.020680 |
692-710 | Steady state analysis of a Mx/G/1 queue with two service modes and multiple vacationsS. Jeyakumar, R. Arumuganathan DOI: 10.1504/IJISE.2008.020681 |
711-726 | Adaptive process control for turning operation using expert systemsBhaskaran Gopalakrishnan, Meredith L. McCoy DOI: 10.1504/IJISE.2008.020682 |
727-745 | Ergonomics interventions improve quality in manufacturing: a case studyOguzhan Erdinc, Ozalp Vayvay DOI: 10.1504/IJISE.2008.020683 |