European Journal of Industrial Engineering
2020 Vol.14 No.5
Pages | Title and author(s) |
599-631 | Project management under uncertainty: using flexible resource management to exploit schedule flexibilityJoão Faria; Madalena Araújo; Erik Demeulemeester; Anabela Tereso DOI: 10.1504/EJIE.2020.109899 |
632-648 | Performance enhancement of production systems using fuzzy-based availability analysis and simulation methodMerve Uzuner Sahin; Berna Dengiz; Kumru Didem Atalay DOI: 10.1504/EJIE.2020.109914 |
649-683 | Neoteric ranked set sampling based combined Shewhart-CUSUM and Shewhart-EWMA control charts for monitoring the process locationTahir Nawaz; Dong Han DOI: 10.1504/EJIE.2020.109913 |
684-714 | An efficient generalised opposition-based multi-objective optimisation method for factory cranes with time-space constraintsBinghai Zhou; Xiumei Liao DOI: 10.1504/EJIE.2020.109923 |
715-741 | Efficient matheuristic for the generalised multiple knapsack problem with setupYassine Adouani; Bassem Jarboui; Malek Masmoudi DOI: 10.1504/EJIE.2020.109906 |