
European Journal of Industrial Engineering
2012 Vol.6 No.2
Pages | Title and author(s) |
139-152 | Outsourcing and production scheduling technology adoption in Taiwan: an empirical studyShu-Yun Peng; Hui-Ming Wee; Jui-Chin Jiang DOI: 10.1504/EJIE.2012.045602 |
153-176 | Integrated cooperative inventory models with one vendor and multiple buyers in the supply chainMing-Feng Yang; Yi Lin DOI: 10.1504/EJIE.2012.045603 |
177-198 | Permutation flowshops in group scheduling with sequence-dependent setup timesB. Naderi; Nasser Salmasi DOI: 10.1504/EJIE.2012.045604 |
199-215 | Minimising makespan for multistage hybrid flowshop scheduling problems with multiprocessor tasks by a hybrid immune algorithmKuo-Ching Ying DOI: 10.1504/EJIE.2012.045605 |
216-233 | The transportation value stream map (TVSM)Bernardo Villarreal DOI: 10.1504/EJIE.2012.045606 |
234-258 | Solving the optimal process target problem using computer-generated experimental designsPaul L. Goethals; Byung Rae Cho DOI: 10.1504/EJIE.2012.045607 |