Pages | Title and author(s) |
1-16 | Establishment of semiconductor equipment purchasing evaluation model based on a knowledge management databaseChing-Chow Yang, Bai-Sheng Chen, Shu-Yun Peng, Tsu-Ming Yeh, Lung-Chia Wang DOI: 10.1504/EJIE.2008.016326 |
17-34 | A study on human-task-related performances in converting conveyor assembly line to cellular manufacturingIkou Kaku, Yasuhiko Murase, Yong Yin DOI: 10.1504/EJIE.2008.016327 |
35-49 | Forming relationships with stakeholders in engineering projectsJan Terje Karlsen DOI: 10.1504/EJIE.2008.016328 |
50-72 | A survey of the literature on the multiple or parallel assembly line balancing problemAmaia Lusa DOI: 10.1504/EJIE.2008.016329 |
73-93 | The reference installation approach for the estimation of industrial assets at riskJutta Geldermann, Mirjam Merz, Valentin Bertsch, Michael Hiete, Otto Rentz, Isabel Seifert, Annegret H. Thieken, Dietmar Borst, Ute Werner DOI: 10.1504/EJIE.2008.016330 |
94-107 | Spare parts criticality for unplanned maintenance of industrial systemsD. Tsakatikas, S. Diplaris, M. Sfantsikopoulos DOI: 10.1504/EJIE.2008.016331 |