European Journal of Industrial Engineering
2007 Vol.1 No.4
EJIE Referees 2006 |
Pages | Title and author(s) |
355-369 | Analysing inaccurate judgemental sales forecastsAnnastiina Kerkkanen, Janne Huiskonen DOI: 10.1504/EJIE.2007.015387 |
370-390 | A Lagrangian Relaxation approach for production planning with demand uncertaintyHaoxun Chen DOI: 10.1504/EJIE.2007.015390 |
391-413 | Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup timesS. Hamed Hendizadeh, Tarek Y. ElMekkawy, G. Gary Wang DOI: 10.1504/EJIE.2007.015388 |
414-430 | Operator staffing and scheduling for an IT-help call centreHesham K. Alfares DOI: 10.1504/EJIE.2007.015389 |
431-448 | Heuristics for the single machine scheduling problem with early and quadratic tardy penaltiesJorge M.S. Valente DOI: 10.1504/EJIE.2007.015391 |
449-461 | An analysis of the stochastic behaviour for shift conversion systemK. Senthamarai Kannan, C. Vijayalakshmi DOI: 10.1504/EJIE.2007.015392 |