Journal cover image

Browse issues


Vol. 11
Vol. 10
Vol. 9
Vol. 8
Vol. 7
Vol. 6
Vol. 5
Vol. 4
Vol. 3
Vol. 2
Vol. 1

European Journal of Industrial Engineering

2013 Vol. 7 No. 5

 

PagesTitle and authors
529-557Minimising the total weighted tardiness for non-identical parallel batch processing machines with job release times and non-identical job sizes
Fuh-Der Chou
DOI: 10.1504/EJIE.2013.057380

558-576Development of lower bounds for the scheduling of setup tasks in serial production lines
Cédric Pessan; Emmanuel Néron; Mohamed Haouari
DOI: 10.1504/EJIE.2013.057383

577-593Economic order quantity for a power demand pattern system with deteriorating items
Joaquín Sicilia; Jaime Febles-Acosta; Manuel González-De la Rosa
DOI: 10.1504/EJIE.2013.057381

594-614The median chart with estimated parameters
Philippe Castagliola; Fernanda Otilia Figueiredo
DOI: 10.1504/EJIE.2013.057382

615-634Production scheduling problem with delivery considerations in a mono-product supply chain environment to minimise the total joint cost
Olivier Grunder; Deyun Wang; Abdellah El Moudni
DOI: 10.1504/EJIE.2013.057384

635-656A leader-follower game for the point coverage problem in wireless sensor networks
Mehmet Başdere; Necati Aras; İ. Kuban Altınel; Sezin Afşar
DOI: 10.1504/EJIE.2013.057385