International Journal of Planning and Scheduling
2018 Vol.2 No.4
Pages | Title and author(s) |
273-291 | Simultaneous scheduling and lot-sizing with earliness/tardiness penaltiesParinaz Vaez; Mehdi Bijari; Ghasem Moslehi DOI: 10.1504/IJPS.2018.095416 |
292-310 | A survey and classification of service-staff scheduling models that address employee preferencesJohn S. Loucks DOI: 10.1504/IJPS.2018.095455 |
311-330 | Material-handling-system-based input control policy for wafer fabricationMing Chen; Subhash C. Sarin DOI: 10.1504/IJPS.2018.095456 |
331-349 | New heuristics for the balanced k-Chinese postmen problemYasemin Limon; Meral Azizoğlu DOI: 10.1504/IJPS.2018.095457 |
350-372 | Analyses of the phase I postanesthesia care unit baseline capacity and effect of disruptions to its beds or nurse availability on operating room workflowDanial Khorasanian; Franklin Dexter; Ghasem Moslehi DOI: 10.1504/IJPS.2018.095441 |