International Journal of Planning and Scheduling
2015 Vol.2 No.2
Pages | Title and author(s) |
87-109 | Minimising the total weighted tardiness and instability for the parallel machine re-scheduling problem with deadlines and ready timesSezgin Kaplan; Ghaith Rabadi DOI: 10.1504/IJPS.2015.072084 |
110-133 | A random keys genetic algorithm for a bicriterion project selection and scheduling problemNatalia Summerville; Reha Uzsoy; Juan Gaytán DOI: 10.1504/IJPS.2015.072105 |
134-153 | Mine production scheduling for poly-metallic mineral deposits: extension to multiple processesYuksel Asli Sari; Mustafa Kumral DOI: 10.1504/IJPS.2015.072107 |
154-178 | Planning and management of major sporting events: a surveyGhaith Rabadi; Wael Khallouli; Mohammed Al-Salem; Ahmed Ghoniem DOI: 10.1504/IJPS.2015.072122 |