
International Journal of Planning and Scheduling
2012 Vol.1 No.3
Pages | Title and author(s) |
147-170 | Diversity guided genetic algorithm to solve the resource constrained project scheduling problemIsraa' Y. Ismail; Mahmoud A. Barghash DOI: 10.1504/IJPS.2012.050125 |
171-208 | Minimising makespan for a two-machine, flow shop, single-wafer-processing, multiple-jobs-per-carrier scheduling problemSubhash C. Sarin; Lixin Wang; Ming Cheng DOI: 10.1504/IJPS.2012.050126 |
209-233 | A generic FPTAS for partition type optimisation problemsMikhail Y. Kovalyov; Wieslaw Kubiak DOI: 10.1504/IJPS.2012.050127 |