International Journal of Advanced Operations Management
2018 Vol.10 No.3
Pages | Title and author(s) |
183-198 | Developing a time-cost trading-off model for construction projects in fuzzy environment (case study: weigh in motion system)Solmaz Salehzadeh; Abbas Mahmoudabadi DOI: 10.1504/IJAOM.2018.093738 |
199-233 | Development of efficient genetic algorithm for open shop scheduling problem to minimise makespanEllur Anand; R. Panneerselvam DOI: 10.1504/IJAOM.2018.093737 |
234-251 | Simulation modelling and analysis of dispatching rules in an assembly job shop production system with machine breakdownsMidhun Paul; T. Radha Ramanan; R. Sridharan DOI: 10.1504/IJAOM.2018.093739 |
252-280 | Feasibility analysis of FMS in small and medium scale Indian industries with a hybrid approach using ISM and TOPSISSandhya Dixit; Tilak Raj DOI: 10.1504/IJAOM.2018.093740 |