International Journal of Operational Research
2009 Vol.4 No.2
Pages | Title and author(s) |
125-141 | Multiple component series systems with imperfect repairMohammed Hajeeh, Faten Jabsheh DOI: 10.1504/IJOR.2009.022596 |
142-158 | Ranking as parameter estimationMiroslav Karny, Tatiana Valentine Guy DOI: 10.1504/IJOR.2009.022597 |
159-177 | Two-phase heuristics for scheduling of multiple projectsM.L. Mittal, Arun Kanda DOI: 10.1504/IJOR.2009.022598 |
178-196 | A heuristical approach for Farmer's problem with uniform continuous random yieldsMurat Kurt DOI: 10.1504/IJOR.2009.022599 |
197-213 | GA based static scheduling of multilevel assembly job shopsM. Omkumar, P. Shahabudeen, S. Gughan, A. Azad DOI: 10.1504/IJOR.2009.022600 |
214-229 | A mathematical model for diffusion of products with multiple generationsAmit Kumar Bardhan, Udayan Chanda DOI: 10.1504/IJOR.2009.022601 |