International Journal of Mathematics in Operational Research
2015 Vol.7 No.1
Pages | Title and author(s) |
1-18 | A bi-level multi-choice programming problemAvik Pradhan; M.P. Biswal DOI: 10.1504/IJMOR.2015.065945 |
19-41 | Analysis of M[X]/G/1 retrial queue with two phase service under Bernoulli vacation schedule and random breakdownP. Rajadurai; M. Varalakshmi; M.C. Saravanarajan; V.M. Chandrasekaran DOI: 10.1504/IJMOR.2015.065946 |
42-51 | Availability modelling and evaluation of a repairable system subject to minor deterioration under imperfect repairsIbrahim Yusuf DOI: 10.1504/IJMOR.2015.065955 |
52-68 | A multi objective model for determining ordering strategy within different constraintsSeyed Hamid Reza Pasandideh; Marziye Keshavarz DOI: 10.1504/IJMOR.2015.065957 |
69-102 | An integrated production-inventory model with backorder and lot for lot policy in fuzzy senseGour Chandra Mahata DOI: 10.1504/IJMOR.2015.065958 |
103-118 | On the choice of the penalty parameter for discrete-continuous linear bi-level problems reformulationMassimiliano Caramia; Renato Mari DOI: 10.1504/IJMOR.2015.065959 |