
International Journal of Mathematics in Operational Research
2012 Vol.4 No.5
Pages | Title and author(s) |
473-502 | Fuzzy EOQ models with ramp type demand rate, partial backlogging and time dependent deterioration rateRavi Shankar Kumar; S.K. De; A. Goswami DOI: 10.1504/IJMOR.2012.048927 |
503-514 | Polynomial formulation and heuristic based approach for the k-travelling repairman problemImen Ome Ezzine; Sonda Elloumi DOI: 10.1504/IJMOR.2012.048928 |
515-530 | Managing supply chain disruption risks: a game-theoretical approachKonstantinos Papapanagiotou; Dimitrios Vlachos DOI: 10.1504/IJMOR.2012.048929 |
531-547 | Sensitivity analysis for fuzzy linear programming problems based on interval-valued fuzzy numbersAmit Kumar; Neha Bhatia DOI: 10.1504/IJMOR.2012.048930 |
548-585 | Asymptotic analysis of European and American options with jumps in the underlyingLamia Benothman; Faouzi Trabelsi DOI: 10.1504/IJMOR.2012.048931 |
586-605 | Load sharing M-out of-N: G system with non-identical components subject to common cause failureMadhu Jain; Ritu Gupta DOI: 10.1504/IJMOR.2012.048932 |