Cost-benefit analysis of suggested Ramadi Barrage hydroelectric plant on the Euphrates River Online publication date: Thu, 28-Jul-2022
by Sadeq Oleiwi Sulaiman; Ahmed Imad Rajaa
International Journal of Computer Aided Engineering and Technology (IJCAET), Vol. 17, No. 1, 2022
Abstract: In recent times, the demand for electricity has increased in the world for many reasons including the increase in the population. Power can obtained from many sources but clean energy is the focus of scientific research in the world now due to increased gas emissions and trying to find a cheaper alternative to oil derivatives. In this research, the electricity generation from low-altitude systems and the potential profits and costs of the project were assessed. The Ramadi barrage across the Euphrates at Anbar province of Iraq was taken as a case study. The number of turbines to be developed in the study area is 6 Kaplan turban. The amount of energy to be produced from the Ramadi barrage would be between 12-24 megawatts at a total cost of 4,309,427$ with total benefits 7,999,018 $ /year.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Computer Aided Engineering and Technology (IJCAET):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com