Title: Time-cost-quality-risk trade-off in GIGA projects using specific techniques of hunting dolphins
Authors: Behzad Paryzad; Nasser Shahsavari Pour
Addresses: Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Kerman, Iran ' Department of Industrial Engineering, Vali-e-Asr University, Rafsanjan, Iran
Abstract: The factors cost quality and project delivery risk are important in increasing decision making accuracy and project performing output. The accuracy of the parameters increase, while the project in developed. We should reduce the project performing time and cost according to the quality increase. The source limitation and the project delivery risk must be considered since optimisation in essential. This model is a trade-off among time, cost, risk and their risk the highest quality. In the paper, considering the dolphin lifestyle and feeding method, an extra initiative logarithm is presented. Specific techniques of hunting dolphins (STHD) is introduced and applied to solve the trade-off problems (for showing this method qualification and features an example in give and optimised) and suitable solution in decision and performance have been applied. The achieved computed conclusions of performing this algorithm are compared with the invasive weeds growth algorithms and the method flexibility is analysed using analysis of variance.
Keywords: project optimisation; time cost quality risk trade-offs; hunting dolphins; project management; dolphin lifestyle; dolphin feeding; invasive weeds; analysis of variance; ANOVA; project delivery.
DOI: 10.1504/IJISE.2016.075207
International Journal of Industrial and Systems Engineering, 2016 Vol.22 No.4, pp.484 - 499
Received: 21 Dec 2013
Accepted: 17 May 2014
Published online: 08 Mar 2016 *