Title: Reliability-based maintenance scheduling of haulage system of drum shearer
Authors: Seyed Hadi Hoseinie, Reza Khalokakaie, Mohammad Ataei, Uday Kumar
Addresses: Faculty of Mining, Petroleum & Geophysics, Shahrood University of Technology, Shahrood 3619995161, Iran. ' Faculty of Mining, Petroleum & Geophysics, Shahrood University of Technology, Shahrood 3619995161, Iran. ' Faculty of Mining, Petroleum & Geophysics, Shahrood University of Technology, Shahrood 3619995161, Iran. ' Division of Operation and Maintenance Engineering, Lulea University of Technology, Lulea, Sweden
Abstract: Drum shearer is the most important component of production chain in longwall mining. This machine is driven along the face by a powerful haulage system. In this paper, the reliability of haulage system of shearer has been analysed. The result showed that Time Between Failures (TBF) data of this system obeys the three-parameter Weibull distribution. On the basis of the achieved reliability model, the Preventive Maintenance (PM) scheduling has been suggested for different reliability levels. The reliability-based maintenance intervals for 90, 80, 70 and 50% reliability are 19.4, 35, 49 and 96.8 h, respectively. If 35 h are considered as the PM intervals, mean TBF will be increased by 16.2%.
Keywords: drum shearer; haulage systems; maintenance scheduling; reliability; longwall mining; time between failures; TBF; preventive maintenance.
DOI: 10.1504/IJMME.2011.041447
International Journal of Mining and Mineral Engineering, 2011 Vol.3 No.1, pp.26 - 37
Published online: 23 Jul 2011 *
Full-text access for editors Full-text access for subscribers Purchase this article Comment on this article