Title: An optimisation technique for crashing PERT network in project management

Authors: Bibhuti Bhusan Tripathy

Addresses: Symbiosis Institute of Operations Management, A-23, Shravan sector, CIDCO, Nashik 422008, Maharashtra, India

Abstract: The planning and the subsequent scheduling of a complex project allow us, to identify the duration of the project itself in relation to the assignment costs of the various activities, so as to achieve an acceptable situation of balance between times and costs. This paper presents a method for shortening total project time by determining appropriate activities for crashing in program evaluation review technique (PERT) with a minimum cost. The aim of the study is to crash the pessimistic time in PERT networks by investing the additional amount of money in the activities on the critical path.

Keywords: project management; PERT; crashing; project duration; total project time; critical path.

DOI: 10.1504/IJOR.2011.038902

International Journal of Operational Research, 2011 Vol.10 No.3, pp.277 - 289

Published online: 14 Feb 2015 *