Title: Implementing COCOMO II as personnel direct cost in an owner estimate cost model for software project

Authors: Sholiq Sholiq; Apol Pribadi Subriadi; Eko Wahyu Tyas Darmaningrat; Abdul Azis

Addresses: Department of Information Systems, Institut Teknologi Sepuluh Nopember, Kampus ITS, Sukolilo-Surabaya 60111, Surabaya, Indonesia ' Department of Information Systems, Institut Teknologi Sepuluh Nopember, Kampus ITS, Sukolilo-Surabaya 60111, Surabaya, Indonesia ' Department of Information Systems, Institut Teknologi Sepuluh Nopember, Kampus ITS, Sukolilo-Surabaya 60111, Surabaya, Indonesia ' Department of Information Systems, Institut Teknologi Sepuluh Nopember, Kampus ITS, Sukolilo-Surabaya 60111, Surabaya, Indonesia

Abstract: COCOMO II is a method to get effort, time (schedule), and cost for software development. In this study, COCOMO II was used to obtain personnel direct costs of a software development project. Personnel direct costs were one of the three components that compose the owner estimate cost. The purpose of this study was to propose a conceptual model to determine the owner estimate cost that was formed from three components, namely: personnel direct cost, non-personnel direct costs, and taxes. In this study, it was explained the stages of using the model to determine the owner estimate cost for software development projects.

Keywords: COCOMO II; owner estimate cost; OEC; software cost; software project.

DOI: 10.1504/IJBIS.2022.127559

International Journal of Business Information Systems, 2022 Vol.41 No.4, pp.472 - 503

Received: 15 May 2019
Accepted: 01 Nov 2019

Published online: 09 Dec 2022 *

Full-text access for editors Full-text access for subscribers Purchase this article Comment on this article