Title: Study on sand control technology of balanced dense filling for the wells after multiple cyclic steam stimulation

Authors: Qingxin Song; Tianyue Li; Xianyong Liu

Addresses: Binnan Oil Production Plant, Shengli Oilfield Sub-Company, Bin zhou, Shandong 256600, China ' Oil and Gas Field Development Engineering, Faculty of Petroleum Engineering, Xi'an Shiyou University, Xi'an, Shaanxi 710065, China ' Binnan Oil Production Plant, Shengli Oilfield Sub-Company, Bin zhou, Shandong 256600, China

Abstract: The sand control problems of multiple cyclic steam stimulation (CSS) mainly include destruction of the sand barrier, failure, and short validity period of sand control. Uncompaction of packing layer and loose arrangement of filling sand may cause sand migration or even collapse in the formation, which results in plugging and reducing seepage capacity in the near-wellbore zones. Some bottleneck problems limit the development, such as short effective period of sand control, rapid production decline, casing deformation, and casing damage. Sand plugging or sand burial at the bottom hole mainly causes these problems. To solve the above problems, fibre consolidation with high-temperature resistance is developed. Additionally, the layered sand control and steam injection string are used. Finally, the technology of balanced dense filling and sand control is developed, which can effectively increase the strength of the sand barrier, extend the validity period, and realise high-efficiency development of the wells after multiple CSS.

Keywords: cyclic steam stimulation; heavy oil; high temperature resistance; cementitious materials; layered sand control.

DOI: 10.1504/IJPE.2022.127196

International Journal of Petroleum Engineering, 2022 Vol.4 No.1, pp.1 - 17

Received: 26 May 2021
Accepted: 13 Aug 2021

Published online: 28 Nov 2022 *