Title: Assessment of nested-parallel task model under real-time scheduling on multi-core processors

Authors: Mahesh Lokhande; Mohammad Atique

Addresses: Priyadarshini Institute of Engineering and Technology, RTM Nagpur University, Nagpur, India ' SGB Amravati University, Amravati, India

Abstract: Real-time applications contain numerous time-bound parallel tasks with enormous computations. Parallel models, not the sequential models, have the capability to handle intra-task parallelism and accomplish such tasks in a specific time or before. Previous researchers presented the task models for parallel tasks, but not for the nested-parallel tasks. This paper deals with the real-time scheduling of periodic nested-parallel tasks having an implicit deadline on multi-core processors. Initially, an nested-parallel task model is developed. Next, a novel task disintegration technique is studied where the MAM's ratio is defined to categorise the segments. It is theoretically proved that the discussed disintegration technique achieved a speedup factor of 4.30 and 3.40 when the tasks, after disintegration, are scheduled under partitioned deadline monotonic (DM) and global earliest deadline first (EDF) scheduling, respectively. Further, considering the overhead factor (β) for non-preemptive global EDF scheduling, disintegration technique is analysed and achieved a speedup factor of 3.73 (for β = 1). The proposed disintegration technique is assessed through the simulations thereby indicating the adequacy of derived speedup factors.

Keywords: nested-parallel tasks; real-time scheduling; partitioned DM scheduling; earliest deadline first; EDF scheduling; multi-core processors; task disintegration; speedup factor.

DOI: 10.1504/IJCSE.2019.103956

International Journal of Computational Science and Engineering, 2019 Vol.20 No.3, pp.299 - 316

Received: 18 Mar 2017
Accepted: 17 Dec 2017

Published online: 03 Dec 2019 *

Full-text access for editors Full-text access for subscribers Purchase this article Comment on this article