Finite capacity material requirement planning with supplier constraints Online publication date: Fri, 25-Jul-2014
by Benyaphorn Paopongchuang; Pisal Yenradee
International Journal of Industrial and Systems Engineering (IJISE), Vol. 17, No. 3, 2014
Abstract: This paper develops a practical finite capacity material requirement planning (FCMRP) system that considers finite capacity of work centres and constraints of suppliers. First, a variable lead-time MRP system is used to transform the customer orders to planned work and purchase orders. The purchase orders are evaluated and revised by the suppliers based on their constraints. Second, the system schedules manufacturing operations on key work centres of not only the factory but also suppliers. Third, a linear programming model is used to determine the optimal start time of each manufacturing operation to minimise the overall performance index, considering finite capacity of all work centres, precedence constraints of operations, and supplier constraints. The proposed FCMRP system is tested using an experimental case. The results indicate that all scheduling mechanisms have significant effect on the overall performance index and the FCMRP system with supplier constraints can generate more realistic schedule than the system without supplier constraints.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com