Ontario railways before 1880: a scrap-iron bonanza
by Thomas F. McIlwraith
Progress in Industrial Ecology, An International Journal (PIE), Vol. 3, No. 4, 2006

Abstract: The construction of the first generation of railways in Ontario, Canada, was undertaken without the benefit of adequate capital investment. The result was cheaply-built track and rolling stock that wore out with unanticipated rapidity. Substantial replacement and design changes became a part of the railroad-building process. The failure – sometimes with catastrophic results – of poor quality iron rails, wheels, boilers and castings of every description yielded a steady flow of scrap iron from before 1860 onward, and estimates its volume form a central aspect of this paper. Railroad scrap peaked in the 1870s as hundreds of miles of new, more durable steel rails replaced iron ones. This surge of scrap iron fed a flourishing foundry business in southern Ontario late in the 19th century, and quite possibly retarded the establishment of Canada's domestic steel industry.

Online publication date: Wed, 20-Dec-2006

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the Progress in Industrial Ecology, An International Journal (PIE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com