Title: Optimal reserve inventory from output of one machine to input of two machines when inter-arrival breakdown is a random variable

Authors: C.D. Nandakumar; S. Srinivasan; R. Sathiyamoorthi

Addresses: Department of Mathematics and Actuarial Science, BS Abdur Rahman University, Chennai, Tamilnadu, India ' Department of Mathematics and Actuarial Science, BS Abdur Rahman University, Chennai, Tamilnadu, India ' Department of Statistics, Annamalai University, Chidambaram, Tamilnadu, India

Abstract: In this paper, a two stage production process is considered such that there is only one machine M1 in the first stage and two machines M2′, M2″ in the second stage. It is assumed that the output of M1 is the input for M2′, M2″. During the breakdown time of M1, a reserve inventory is suggested for M2′, M2″, to prevent the idle time, which is costlier. An inventory model is derived here based on certain assumptions to find the optimum size of the reserve inventory of the semi-finished product of the machine M1 to supply the machines M2′, M2″ till M1 resumes the function. Numerical illustrations are provided.

Keywords: breakdowns; repair time; inventory; change point; SCBZ property; production; shortages.

DOI: 10.1504/IJPMB.2019.099329

International Journal of Process Management and Benchmarking, 2019 Vol.9 No.2, pp.173 - 192

Received: 23 Mar 2016
Accepted: 31 Dec 2016

Published online: 29 Apr 2019 *

Full-text access for editors Full-text access for subscribers Purchase this article Comment on this article