Title: BIM-based cycle control method for the whole process of building production and construction
Authors: Xinjie Yuan
Addresses: Department of Architecture and Civil Engineering, Xinxiang Vocational and Technical College, Xinxiang, Henan, 453006, China
Abstract: In order to overcome the problems of poor convergence and low control accuracy of conventional cycle control for the whole process of building production and construction due to the lack of consideration of parameter fusion and resource scheduling, a new BIM-based cycle control method for the whole process is proposed. A whole-process cycle control constraint model is constructed for parameter analysis, and with the BIM technology, parameter fusion is carried out to judge control convergence. With the BIM scheduling method, a resource scheduling control model for cycle control is constructed, so as to effective control and manage the whole process cycle. The experimental results show that the method proposed in this paper can deliver better convergence and lower control error for whole-process cycle control, the lowest difference of safety quality control was less than 0.01, which demonstrates that the method has a strong ability in carrying out whole-process cycle control.
Keywords: BIM; building production and construction; whole-process; cycle control; information fusion; convergence.
DOI: 10.1504/IJCIS.2023.130447
International Journal of Critical Infrastructures, 2023 Vol.19 No.2, pp.95 - 107
Received: 19 Nov 2020
Accepted: 08 Feb 2021
Published online: 21 Apr 2023 *