Title: A bi-level programming model of rough stochastic MRCPSP in large-scale hydropower construction project

Authors: Zhe Zhang; Xiaoling Song

Addresses: School Economics and Management, Nanjing University of Science and Technology, Nanjing 210094, China ' School Economics and Management, Nanjing University of Science and Technology, Nanjing 210094, China

Abstract: This paper focuses on developing a bi-level programming model for rough stochastic multi-mode resource constrained project scheduling problem (RS-MRCPSP/bi-level). The metal structure installation project (MSIP) in Wudongde Hydropower Station is considered as the prototype, and then it is extended to be a generalised bi-level MRCPSP. In the upper level, the construction contractor is responsible for the investment on the activity, while the outsourcing partner is in charge of construction and implementation in the lower level. In order to deal with the rough stochastic parameters, the rough stochastic expected value operator is employed. Subsequently, in order to obtain the optimal schedule, an interactive method-based passive congregation particle swarm optimisation (IM-based PCPSO) is designed. Finally, a practical application for MSIP is presented to highlight the practicability of proposed model and solution method.

Keywords: bi-level programming; multi-mode; resource constrained project scheduling problem; RCPSP; rough stochastic parameters; particle swarm optimisation; PSO.

DOI: 10.1504/IJADS.2020.106423

International Journal of Applied Decision Sciences, 2020 Vol.13 No.2, pp.123 - 152

Received: 30 Oct 2018
Accepted: 14 Mar 2019

Published online: 06 Apr 2020 *