Optimal cycle length and number of inspections in imperfect production processes with investment on setup cost reduction and quality improvement Online publication date: Sun, 25-Jan-2009
by Mallika Parveen, T.V.V.L.N. Rao
International Journal of Manufacturing Research (IJMR), Vol. 4, No. 1, 2009
Abstract: The work presented in this paper is derived from an existing model for an imperfect process model (Moon et al., 2002) under constraint of setup time, and the total production time per cycle is equal to the cycle length. This paper considers the investment in setup cost reduction and quality improvement in: imperfect production process; imperfect production process with inspection and restoration. A solution algorithm using the Lagrangian approach with the objective of minimising the expected total cost is developed to simultaneously solve the cycle length, number of inspections, setup reduction and quality improvement for different products. Numerical examples are used to illustrate comparison of the performances with investment in setup cost reduction and quality improvement. [Received 11 August 2007; Revised 20 December 2007; Accepted 4 May 2008]
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Manufacturing Research (IJMR):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com