A process planning strategy for multi-axis hybrid manufacturing process
by Jun Zhang; Jianzhong Ruan; Frank Liou
International Journal of Rapid Manufacturing (IJRAPIDM), Vol. 3, No. 2/3, 2013

Abstract: This paper outlines a process planning strategy for a multi-axis hybrid manufacturing process that includes a metal deposition system and a multi-axis CNC machining system to rapidly manufacture precision metal parts. Different from the current layered manufacturing processes of which build direction is fixed throughout the process, the orientation of the part can affect the non-support buildability in the multi-axis hybrid manufacturing process. However, each orientation that satisfies the buildability and other constraints may not be unique. In this case, the final optimal orientation is determined based on build time. The build time computation algorithm for multi-axis hybrid system is presented in this paper. To speed up the exhaustive search for the optimal orientation, a multi-stage algorithm is developed to reduce the search space. A case study is used as an example to show the process planning strategy.

Online publication date: Tue, 23-Sep-2014

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Rapid Manufacturing (IJRAPIDM):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com