
International Journal of Mining and Mineral Engineering
2012 Vol.4 No.2
Pages | Title and author(s) |
89-115 | A hierarchical open-pit mine production scheduling optimisation modelHesameddin Eivazy; Hooman Askari-Nasab DOI: 10.1504/IJMME.2012.052436 |
116-138 | Mining in Jordan: challenges and prospectsRami Alrawashdeh; Salah Al-Thyabat DOI: 10.1504/IJMME.2012.052437 |
139-150 | Simultaneous initiation of cut and production holes in trench method of blastingS.K. Mandal; M.M. Singh; N.K. Bhagat DOI: 10.1504/IJMME.2012.052441 |
151-162 | Multiobjective optimisation of spiral concentrator for separation of ultrafine chromiteSunil Kumar Tripathy; Y. Rama Murthy DOI: 10.1504/IJMME.2012.052440 |
163-173 | Prediction of rock fracture toughness modes I and II utilising brittleness indexesO. Saeidi; S.R. Torabi; M. Ataei; S.H. Hoseinie DOI: 10.1504/IJMME.2012.052442 |