European Journal of Industrial Engineering (EJIE)

European Journal of Industrial Engineering

2017 Vol.11 No.6

Special Issue on: Project Management and Scheduling

Guest Editors: Prof. Rubén Ruiz and Prof. Ramón Álvarez-Valdés

Reviewers

Editorial

Pages Title and author(s)
708-724The total adjustment cost problem with variable activity durations and intensities
Lucio Bianco; Massimiliano Caramia; Stefano Giordani
DOI: 10.1504/EJIE.2017.089106
725-751A decomposition heuristic for short-term planning of assessment centres
Tom Rihm; Norbert Trautmann
DOI: 10.1504/EJIE.2017.089099
752-773A mixed-integer programming-based heuristic for project scheduling with work-content constraints
Adrian Zimmermann
DOI: 10.1504/EJIE.2017.089100
774-791An adaptive large neighbourhood search as a matheuristic for the multi-mode resource-constrained project scheduling problem
Patrick Gerhards; Christian Stürck; Andreas Fink
DOI: 10.1504/EJIE.2017.089101
792-817Periodically aggregated resource-constrained project scheduling problem
Pierre-Antoine Morin; Christian Artigues; Alain Haït
DOI: 10.1504/EJIE.2017.089108
818-853Multi-objective binary cuckoo search for constrained project portfolio selection under uncertainty
Mohammed M.S. El-Kholany; Hisham M. Abdelsalam
DOI: 10.1504/EJIE.2017.089107