Techno-economic evaluation of revamping of coal-fired power plants in India Online publication date: Mon, 08-May-2006
by Animesh Dutta, Shantanu Dutta, Prabir Basu
International Journal of Global Energy Issues (IJGEI), Vol. 26, No. 1/2, 2006
Abstract: A techno-economic feasibility study has been conducted to investigate the revamping of two 32 MWe Pulverised-Coal (PC) boilers with a number of firing options. The options investigated were: (1) conventional PC revamping, (2) replacement with a new PC boiler, (3) PC to Circulating Fluidised Bed (CFB) revamping, (4) replacement with a new CFB boiler, and (5) Bubbling Fluidised Bed (BFB) revamping. The study reveals that: (i) CFB revamping of the boilers is technically feasible and economically viable; (ii) Performance improvement of the plant is significant in terms of such indices as plant load factor, forced outage and auxiliary oil consumption; (iii) Significant improvement in emissions performance due to the reduction in emissions of NOx and fly ash is projected; (iv) CFB revamping option gives the highest return on investment compared to alternatives. Finally, to demonstrate the technical soundness and viability of the special design used in this revamping, a subscale CFB boiler has been designed and built at another power plant.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Global Energy Issues (IJGEI):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com