Reaping socio-economic blessings of flowing water: evidence from hydropower initiatives of China-Pakistan Economic Corridor Online publication date: Wed, 03-Oct-2018
by Ejaz Gul
International Journal of Water (IJW), Vol. 12, No. 4, 2018
Abstract: More than 76% of the total budget of China Pakistan Economic Corridor (CPEC) is allocated to renewable and non-renewable energy initiatives. This paper elucidates socioeconomic impacts of three hydropower projects of CPEC named as Suki Kinari, Karot and Kohala Hydropower Projects. Primary data on selected socioeconomic variables (SVs) was collected from respondents of the areas where these projects are located. Data was analysed statistically to ascertain existing trends before construction of these projects. Changes in socioeconomic variables (SVs) after construction of these projects were calculated using Khewa's Model. To get representative equations of trends, digital analysis of data was carried out using computer assisted quantitative data analysis software (CAQDAS). After this, socioeconomic indexes (SEIs) of households were calculated before and after construction of these projects using Newton-Leibniz Integration Process (NLIP). Results indicated that there is a substantial increase in socioeconomic status of the households after construction of these hydropower projects.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Water (IJW):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com