Validity of railway microscopic simulations under the microscope: two case studies
by Bill Roungas; Sebastiaan Meijer; Alexander Verbraeck
International Journal of System of Systems Engineering (IJSSE), Vol. 8, No. 4, 2018

Abstract: Simulations are the core of every railway system. Changes in the timetable and the infrastructure, or even in the internal processes of a railway company should be, and usually are, first tested through simulations. Given their significance and potential impact, simulations should be primarily validated; validation ensures - at least to some extent - that the returned results are credible and can be used for the intended purpose. This study is a detailed report on two case studies from the railway sector. The aim of this paper is to identify critical factors that can advance or hinder the validity and the effective usage of simulation models.

Online publication date: Thu, 06-Sep-2018

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of System of Systems Engineering (IJSSE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com