Group maintenance strategy for stochastic selective maintenance Online publication date: Tue, 07-Aug-2018
by Jing Zhao; Jianchao Zeng
International Journal of Wireless and Mobile Computing (IJWMC), Vol. 14, No. 4, 2018
Abstract: Selective maintenance is often applied to many industrial environments when the maintenance actions are performed between sequence missions. When the length of maintenance or work mission time is stochastic and there are multiple maintenance workers with different capacity, previous works to determine maintenance and mission times are unsuitable for it. Assuming that the time of work mission is random and maintenance time is determined, to maximise system reliability of next work mission, this paper proposes a stochastic model for a two-state system comprising several series-parallel components with multiple maintenance workers under the maintenance time limit. The optimal maintenance plan is obtained by hybrid intelligent optimisation algorithm. The validity and feasibility of the model are verified by the simulation.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Wireless and Mobile Computing (IJWMC):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com