A fuzzy logic-based approach for multistage flowshop scheduling with arbitrary lags and transportation time
by Shefali Aggarwal; Deepak Gupta; Sameer Sharma
International Journal of Operational Research (IJOR), Vol. 29, No. 1, 2017

Abstract: The aim of this paper is to introduce the concept of arbitrary lags in n-jobs, m machines flowshop scheduling problem involving the processing times and transportation times of jobs. Start lag is the minimum time which must elapse between starting of job i on the first machine and starting of job i on the last machine. The stop lag for the job i is the minimum time which must elapse between completing job i on the first machine and completing it on the last machine. The concept of fuzzy processing time to represent the uncertainty, vagueness in processing of jobs is introduced. An algorithm to find the optimal sequence so as to minimise the total elapsed time subject to some specified lag time constraint is discussed. A numerical illustration is given to demonstrate the computational efficiency of proposed algorithm as a valuable analytical tool for the researchers.

Online publication date: Wed, 22-Mar-2017

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Operational Research (IJOR):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com