Function-based scheduling method on initial identified water level of reservoir long-term optimal scheduling Online publication date: Thu, 07-Apr-2016
by Cailin Li; Chao Wang; Junchao Li; Qiaoya Liu; Xiaoju Wu; Ping Yang
International Journal of Materials and Structural Integrity (IJMSI), Vol. 9, No. 4, 2015
Abstract: In this paper, a function-based scheduling method combining with statistical analysis of historical runoff data and inflow data is proposed to calculate the initial water level of a reservoir under long-term optimal operation. Two-ary interpolation function and database searching are integrated in the solving process. An example is taken to demonstrate the feasibility and engineering practicability of this method. Initial water level obtained by this method establishes a foundation for making optimal scheduling plans.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Materials and Structural Integrity (IJMSI):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com