Scheduling optimisation of a real flexible job shop including fixture availability and preventive maintenance Online publication date: Tue, 31-Mar-2015
by Karin Thörnblad; Ann-Brith Strömberg; Michael Patriksson; Torgny Almgren
European J. of Industrial Engineering (EJIE), Vol. 9, No. 1, 2015
Abstract: The multitask cell at GKN Aerospace Sweden is a flexible job shop containing ten resources aimed at being flexible with regard to product mix and processing types. We present a time-indexed formulation of the problem of optimally scheduling the planned jobs on the resources, also considering a limited availability of fixtures as well as required preventive maintenance activities. The objective is to minimise a weighted sum of the completion times and tardiness for the jobs, where the tardiness weight for a given job is a non-increasing function of its due date. We propose a fast iterative approach to finding a suitable value of the length of the time horizon that needs to be set for the time-indexed formulation and which considerably influences the computation time. Computational results show that the method developed is able to produce optimal, or near-optimal, schedules for real data instances within an acceptable practical time frame. [Received 1 October 2012; Revised 13 May 2013; Accepted 20 September 2013]
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the European J. of Industrial Engineering (EJIE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com