Dynamic Pareto-optimal group scheduling in parallel machine shop Online publication date: Sat, 13-Sep-2014
by Yuri Mauergauz
International Journal of Industrial and Systems Engineering (IJISE), Vol. 18, No. 2, 2014
Abstract: This paper seeks to determine a dynamic Pareto-optimal method for parallel machine scheduling based on two criteria simultaneously: relative manufacturing cost criterion and average orders utility criterion. In this method, the concept of production intensity as a dynamic production process parameter is used. The method is applicable both for 'make-to-order' and 'make-to-stock' manufacturing strategies. A set of applied software allows scheduling for middle quantity of jobs. The result of software application is the set of non-dominant versions proposed to a user for making a final choice.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com