Obsolescence management in rail signalling systems: concept and Markovian modelling
by Kouroush Jenab; Kourosh Noori; Philip D. Weinsier
International Journal of Productivity and Quality Management (IJPQM), Vol. 14, No. 1, 2014

Abstract: Obsolescence is one of the most common reasons for the premature replacement of signalling systems. One of the major reasons for obsolescence is the short lifespan of hardware/software components, which seem to be replaced with newer technologies almost on a daily basis. As a result, it is critical that line replaceable units (LRUs) or lowest level replaceable units (LLRUs) be available over the lifetime of the system and be monitored systematically. Obsolescence monitoring and detection is currently done through linear methods which have many issues due to the non-linear nature of the parameters as well as the inter-dependency of elements. The purpose of this paper is to describe the obsolescence concept in rail signalling and introduce a Markovian obsolescence detection model to avoid early system obsolescence. Normally, suppliers support their customers worldwide with obsolescence monitoring in order to obtain early information on equipment obsolescence issues. Nevertheless, to sustain effective obsolescence management, agencies should allocate adequate resources such as personnel, budget and tools. An obsolescence plan/strategy is discussed in this paper and can be applied across a system's lifecycle. Such an obsolescence plan should be backed up by supply chain strategy during the system lifecycle in conjunction with asset management.

Online publication date: Sat, 26-Jul-2014

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Productivity and Quality Management (IJPQM):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com