Integration of rough-cut-capacity planning with manufacturing resource planning
by P.C. Pandey, M. Ahsan Akhtar Hasin
International Journal of Computer Applications in Technology (IJCAT), Vol. 10, No. 5/6, 1997

Abstract: In a hypothetical finite loading production system, the production and capacity planning processes should be accomplished primarily on the basis of the limitations of the available resource capacity, rather than focusing on material availability, as is normally done in traditional MRP. Because of this limitation, it is hardly possible to implement the generated MRP schedule without extensive modifications. To resolve this problem and to obtain a feasible Master Production Schedule, the available shop capacity must be taken into consideration at an earlier stage. This study presents a scheme for the integration of Rough-Cut-Capacity-Planning with MRPII with more constraints and elements than considered presently by considering shop capacity during MPS generation (i.e. making the MPS more feasible/realistic).

Online publication date: Mon, 02-Jun-2014

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Computer Applications in Technology (IJCAT):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com