A fuzzified version of the economic production quantity (EPQ) model with backorders and rework for a single-stage system
by Ehsan Shekarian; Mohamad Y. Jaber; Nima Kazemi; Ehsan Ehsani
European J. of Industrial Engineering (EJIE), Vol. 8, No. 3, 2014

Abstract: This paper extends a recent work that investigated a single-stage production-inventory model with reworks and planned backorders by fuzzifying its input parameters. The graded mean integration representation (GMIR) method, a useful and effective defuzzification method, is employed to develop a fuzzified total inventory cost function of model of interest. Triangular and trapezoidal fuzzy numbers are used to examine the developed fuzzy model. Later, the optimal policy, including the batch size, the backordering level and total cost, is determined using the classical approach. Furthermore, the derived optimal policies are tested using arbitrary fuzzy numbers. [Received 4 July 2011; Revised 4 November 2011; Revised 3 February 2012; Revised 16 July 2012; Accepted 27 October 2012]

Online publication date: Sat, 28-Jun-2014

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the European J. of Industrial Engineering (EJIE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com