A stochastic profit-maximising economic lot scheduling problem with price optimisation
by Luciano Salvietti; Neale R. Smith; Leopoldo Eduardo Cárdenas-Barrón
European J. of Industrial Engineering (EJIE), Vol. 8, No. 2, 2014

Abstract: A stochastic version of the economic lot sizing problem with pricing is presented. The control variables of the stochastic problem are the production quantities and cycle lengths for each product. The recourse variables are the sales prices and the external purchase quantities in each production cycle. A solution method based on simulation, decomposition, and column generation is proposed and tested using a number of designed experiments. The method is found to produce very close to optimal solutions quickly. [Received 29 January 2011; Revised 6 February 2011; Revised 21 March 2012; Accepted 3 October 2012]

Online publication date: Sat, 28-Jun-2014

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the European J. of Industrial Engineering (EJIE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com