A supply chain production scheduling with deterioration and release date
by Ebrahim Teimoury; Hamidreza Haddad
International Journal of Rapid Manufacturing (IJRAPIDM), Vol. 3, No. 4, 2013

Abstract: This paper presents an INLP model for problem of production scheduling with release date and deterioration in a three-staged supply chain. A vehicle with limited capacity is used to transport a specific raw material from supplier to manufacturer and another capacitated vehicle sends the finished products from manufacturer to customer. The objective function is minimisation of the total tardiness which is known as a NP-hard problem in literature. A simulated annealing meta-heuristic is used to find near optimal solutions in reasonable run time. In order to check the verification and to validate the proposed model, some small instances of problem are solved optimally using Lingo 11 global solver and are compared to SA results. Furthermore, two lower bounds are also provided for larger scales. Computational studies demonstrate that the proposed SA is capable to find solutions with very low gap in suitable run time.

Online publication date: Tue, 30-Sep-2014

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Rapid Manufacturing (IJRAPIDM):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com