A GRASP approach to transporter scheduling for ship assembly block operations management Online publication date: Fri, 28-Feb-2014
by Changkyu Park; Junyong Seo
European J. of Industrial Engineering (EJIE), Vol. 7, No. 3, 2013
Abstract: In this paper, we address the transporter scheduling problem of ship assembly block operations management, which can be transformed into parallel machine scheduling with sequence-dependent setup times and precedence constraints. The objective is to maximise the workload balance among transporters under the time constraint that all assembly blocks should be transported in the predetermined period. We develop the GRASP algorithm for transporter scheduling, because parallel machine scheduling with sequence-dependent setup times and precedence constraints is an NP-hard problem. Through simulation experiments, we analyse some aspects of the developed GRASP algorithm, and compare the developed GRASP algorithm with other heuristics for large-scale instances and the optimal solution approach for small-sized instances. The comparison experiments show that the developed GRASP algorithm outperforms other heuristics and is a promising heuristic for transporter scheduling. [Received 9 March 2011; Revised 26 June 2011; Revised 10 September 2011; Accepted 15 October 2011]
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the European J. of Industrial Engineering (EJIE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com