The performance of combinatorial priority rules in a manufacturing flow shop Online publication date: Wed, 10-Sep-2014
by Felix T.S. Chan; Hing Kai Chan
European J. of Industrial Engineering (EJIE), Vol. 6, No. 5, 2012
Abstract: Some of the previous research indicates that no single priority rule could perform excellently on those common performance measures. This study focuses on evaluating the impact of deploying combinations of four single priority rules on a three-stage manufacturing flow shop, i.e., different rules are employed at different workstation. Full factorial combinations of four commonly used priority rules, leading to 64 rule combinations, are analysed. Besides, variations in buffer capacity and due date allowance are taken into account. Both terminating and non-terminating systems are investigated in this study. For terminating system, variations in production volume are also considered. Simulation experiments have been conducted and the performance of the combinations is analysed by monitoring four measures, namely: 1) mean lead time; 2) mean tardiness; 3) number of jobs completed; 4) percentage of tardy jobs. [Received 13 November 2010; Revised 8 March 2011; Accepted 18 March 2011]
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the European J. of Industrial Engineering (EJIE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com