Heuristic for integrated purchasing and production planning
by Supakanya Chinprateep, Rein Boondiskulchok
European J. of Industrial Engineering (EJIE), Vol. 5, No. 1, 2011

Abstract: The planning of purchasing and production lot-size for multi-item multi-period multi-workstation capacitated production (MLCLSP-M) is discussed. Since the model is a NP-hard problem, this research proposes a heuristic method (A-LS), which decomposes the model into two sub-problems and iteratively solves them. The two sub-problems consisting of an assignment sub-problem with given lot size and a lot sizing sub-problem with given assignment. Solution method was developed, tested and compared to illustrate the solution quality and computational time. Mathematical models for both sub-problems were solved with AMPL/CPLEX 8.0.0 solver. The computational results indicate that the proposed heuristic (A-LS) gives satisfactory solution with faster solving time comparing with the original mathematical model. [Submitted 15 July 2008; Revised 09 October 2009, 09 December 2009; Accepted 23 December 2009]

Online publication date: Wed, 22-Oct-2014

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the European J. of Industrial Engineering (EJIE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com