Role of manufacturing lead time in capacity planning
by P.C. Pandey, M. Ahsan Akhtar Hasin
International Journal of Materials and Product Technology (IJMPT), Vol. 11, No. 5/6, 1996

Abstract: Manufacturing lead time plays an important role in production as well as capacity planning. To expedite a manufacturing order, the lead time must be controlled. If the required production capacity exceeds the available capacity, it can be increased by overtime planning. Manufacturing lead time can be considered to be the required capacity (rough-cut capacity) for a batch, and if necessary, overtime planning could be employed to assign more work-hours (i.e. available capacity) to the batch to accommodate the batch time within the specified capacity. Thus capacity planning has a significant impact on manufacturing lead time. This paper aims to formulate shop-routing-based measurement of manufacturing lead time, and analysing the impact of overtime (capacity planning) on manufacturing lead time, in order to facilitate integrated production and capacity planning.

Online publication date: Tue, 02-Nov-2010

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Materials and Product Technology (IJMPT):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com