Multistage production systems with random yields and rigid demand
by Tal Ben-Zvi, Abraham Grosfeld-Nir
International Journal of Manufacturing Technology and Management (IJMTM), Vol. 20, No. 1/2/3/4, 2010

Abstract: The increased complexity of contemporary manufacturing makes it hard to maintain a predictable level of output. We consider several types of multistage systems in an environment where yield is random, production is in lots and demand needs to be satisfied in its entirety. For each possible configuration of intermediate inventories a production policy must specify the stage at which to produce next and the lot size to be processed. The objective is to minimise the expected total of setup and variable production costs. We show that the expected cost associated with any arbitrary production policy can be calculated by solving a finite set of linear equations. The result is general in that it applies to any yield structure. We also develop efficient heuristics to solve various multistage systems. Selected numerical results are presented for binomial yields.

Online publication date: Wed, 05-May-2010

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Manufacturing Technology and Management (IJMTM):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com